IMG_20140110_143635.jpg
       
     
PANO_20160908_112912.jpg
       
     
 with an expected completion of 2018 by rushmark / hitt, this 250,000 sqft residence occupies a challenging brownfield nestled between the beltway and a train yard.  brought on partway through schematic design I worked with the hcm design team o
       
     
RenovPres1_BANNER.jpg